Sr. Construction Manager, Data Center Construction
Sr. Construction Manager, Data Center Construction at Amazon — Dallas, TX, US
- Company: Amazon
- Location: Dallas, TX, US
- Posted: 2026-02-07
About this role
AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we’re the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain — and we’re looking for talented people who want to help.
You’ll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You’ll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you’ll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion.
As our Data Center Construction Manager (CM)], you will be a part of a diverse, upbeat, and creative team tasked with solving fascinating problems constructing Amazon Data Centers. Our data centers are industry-leading examples of energy efficient and cost-effective designs.
Key job responsibilities
- Own project scope, quality, schedule, and budget for construction of new builds or general capital projects.
- Own construction project management and oversight of construction related activities.
- Work alongside partner teams such as Operations, Networking, Controls, Security, and Commissioning to build Data Centers that directly support our Customers.
- Be a leader in your specific discipline (construction management, building services, architectural, electrical or mechanical engineering).
- Represent Amazon’s owner’s representative on construction sites daily, as, interacting with construction trades.
- Be Amazon’s construction representative on multiple data centers building and capital improvement construction project sites from construction start through hand-off to operations.
- Direct interface with construction general contractors during the construction bidding, award, execution, punch-list, and closeout phases.
- Create construction project scope and request for proposals.
- Conduct negotiations with general contractors and evaluate bids and proposals with detail and accuracy.
- Manage and drive cost, schedule, and quality while managing construction contractors and vendors.
- Perform construction project management activities, including management of documents, submittals, RFIs, change orders, invoices, quality, scope, and schedule.
- Drive construction teams to troubleshoot and perform root-cause failure analysis on equipment failures.
- Support commissioning and integrated system testing and oversight.
- Support operations of installed facilities, including review of procedures, best practices, and maintenance initiatives.
- Support capital request creation.
- Analyze and report construction progress and financials.
- Record and report key construction metrics to team members and management.
- Contribute to construction initiatives aimed at improving construction efficiency and increasing data center resiliency.
- Provide constructability reviews for electrical and mechanical designs for new or optimization of existing data centers.
About the team
Diverse Experiences
Amazon values diverse experiences. Even if you do not meet all of the preferred qualifications and skills listed in the job description, we encourage candidates to apply. If your career is just starting, hasn’t followed a traditional path, or includes alternative experiences, don’t let it stop you from applying.
Why AWS
Amazon Web Services (AWS) is the world’s most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating — that’s why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses.
Work/Life Balance
We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there’s nothing we can’t achieve in the cloud.
Inclusive Team Culture
Here at AWS, it’s in our nature to learn and be curious. Our employee-led affinity groups foster a culture of inclusion that empower us to be proud of our differences. Ongoing events and learning experiences, including our Conversations on Race and Ethnicity (CORE) and AmazeCon (gender diversity) conferences, inspire us to never stop embracing our uniqueness.
Mentorship and Career Growth
We’re continuously raising our performance bar as we strive to become Earth’s Best Employer. That’s why you’ll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional.
#DCCD_AMER
- Experience in construction management or construction program management of large, complex projects involving large-scale mechanical, electrical, and plumbing (MEP) plants
- Experience in construction of data center delivery (design, commissioning and construction), mission critical facilities, or equivalent industrial/manufacturing facility builds
- Experience constructing electrical engineering systems including large scale power distribution/generation gear and mechanical engineering systems including cooling systems
- Experience in project control (cost or schedule, or both) and formulating construction programmes, especially for infrastructure and mission critical projects both on-site and in preconstruction environments
- Bachelor’s degree in Mechanical Engineering, Electrical Engineering, Construction Management or an equivalent engineering science +7 Years of experience OR 12+ years of related construction management experience in lieu of a degree.
- Experience delivering multi-media environmental due diligence, permitting, and compliance projects with specific expertise in CWA 404 and NPDES permitting, groundwater protection, wastewater discharge, and natural and cultural resource evaluations
- Experience in Project Controls Standards subject matter, including Estimating, Cost Management, Cost Forecasting, Schedule Management, Progress Measurement, Change Management, Risk Management, WBS/CBS/SBS, Cash-Flow (VOWD), and Benchmarking
- Experience in environmental compliance and permitting, waste management, contractual, regulatory, and liability assessments, environmental permit evaluations and applications, EIAs and water discharge requirements
- Bachelor's degree in Construction Management
Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status.
Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit https://amazon.jobs/content/en/how-we-hire/accommodations for more information. If the country/region you’re applying in isn’t listed, please contact your Recruiting Partner.
The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at https://amazon.jobs/en/benefits.
USA, TX, Dallas - 139,300.00 - 208,000.00 USD annually
Or fast-track your application with a Beaverhand AI interview